July 26 |
|
The drainage method of the pond of the school biotope is an Overflow type. We do the second sludge cleaning this time. |
|
It was a strategy to let this strategy created a disturbance at the water of the pond, and sludge overflow with water.It looks like this creates a disturbance and makes a flow of the water. |
|
It is a place for the place among the leaves of the lotus in the center
of the photograph to overflow. We let a current face one point together. |
July 28 |
|
It is the part of the pond after the second sludge cleaning. We had the
parts which sludge disappeared, and showed a bottom. |
|
The photograph which we took toward the bottom of the pond.A bottom became
shallow and came to see a stone. |
|
This is the general view of the present pond. Do you understand that a pond became beautiful? |
|