Introduction of Chiba Nogiku-no-sato Purification plant:Intake facilities
Place
・Yagiri Intake Plant Watere right=2.99m3/second Maximum water intake capacity=258,336m3/day (Details) 195,264m3/day(to Kuriyama) 63,072m3/day(to Chiba Nogiku-no-sato)
TO THE TOP